Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    OMEGA Expands Beyond CGI to Form Full-Service Property Development Marketing Agency

    November 4, 2026

    Modi launches Pune Metro projects worth ₹21,800 crore

    November 4, 2026

    The Cost of a Broken Phone: How the HONOR X9e Pro Is Designed for Everyday Resilience

    November 4, 2026
    Facebook X (Twitter) Instagram
    Kuwait News HubKuwait News Hub
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Kuwait News HubKuwait News Hub
    Home » 28GW TOPCon manufacturing capacity added in Astronergy
    PR Newswire

    28GW TOPCon manufacturing capacity added in Astronergy

    April 28, 2023
    Facebook Twitter Pinterest LinkedIn Reddit WhatsApp Email

    HANGZHOU, China, April 28, 2023 /PRNewswire/ — Manufacturing bases of Astronergy saw 28GW n-type TOPCon manufacturing capacity grow on April 27, marking once more enhancement in the company’s n-type TOPCon production strength after loading 5GW TOPCon module manufacturing capacity in early April this year.

    The phase four project of Astronergy Manufacturing Base saw the move-in of 8GW n-type TOPCon cell equipment and 12GW TOPCon module equipment to one of its new cell workshops and two of its new module workshops on April 27. And at the same day, 8GW TOPCon cell equipment arrived at Astronergy Fengyang Manufacturing Base workshop and was ready to start the trial run.

    A photo captures a new TOPCon module equipment moved in a module workshop in Astronergy Haining Manufacturing Base.

    Loading new TOPCon manufacturing capacities in two manufacturing bases simultaneously, the absolute confidence and strength of Astronergy in its TOPCon tech and TOPCon modules are evident.

    The capacity leapfrog of TOPCon at Haining Manufacturing Base – Astronergy global headquarters and R&D center makes the base hitting production capacities of over 17GW PV cells and over 24GW PV modules.

    Said Haiyan Huang, EVP & CSO at Astronergy, the 8GW TOPCon cell equipment and 12GW TOPCon module equipment are expected to gradually run at full load 60 days later and Haining Base is to fulfil its target of doubling production capacity and production value before 2025.

    As a newly exposed and the sixth manufacturing base of Astronergy, Fengyang Manufacturing Base is in China’s Anhui province, focusing on TOPCon cell production. Soon after the equipment is in place, the manufacturing base will see the rollout of the first piece TOPCon cell in late May and is expected to run at full capacity in June.

    As the pioneer in n-type TOPCon PV modules, Astronergy is aiming to make the TOPCon modules one of its main products. Adding new TOPCon capacities in cells and modules is certainly a firm step forward to being the competitive supplier of PV modules worldwide.

    Photo – https://mma.prnewswire.com/media/2065455/A_n_type_TOPCon_PV_module_manufacturing_equipment_moved_a_workshop.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/28gw-topcon-manufacturing-capacity-added-in-astronergy-301810467.html

    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Email

    Related Posts

    The Cost of a Broken Phone: How the HONOR X9e Pro Is Designed for Everyday Resilience

    November 4, 2026

    Gorenje Celebrates the Joy of Cooking with Exclusive Built-in Kitchen Appliances Promotion in the UAE

    November 4, 2026

    Fractal delivers its first ever $100 million revenue quarter, reports EBITDA growth of 71% YoY

    November 4, 2026

    H.E. Ahmed Al-Khateeb, Saudi Minister of Tourism, Inaugurates Saudi Land at WTM London 2026, Reinforcing Saudi’s Commitment to Global Travel Trade

    November 3, 2026

    Shudao Investment Group Shines at the Global Panda Partners Conference 2026

    November 3, 2026

    Modaxo Welcomes Fiscaltech

    November 3, 2026
    Latest News
    News

    Modi launches Pune Metro projects worth ₹21,800 crore

    November 4, 2026

    – Prime Minister Narendra Modi on Tuesday inaugurated and laid the foundation stone for Pune Metro projects worth around ₹21,800 crore through video conferencing. He opened the Hinjawadi to Shivajinagar corridor, which links a major IT hub to the city

    MEAPMP Launches: Revamped Independent Ad-Tech & Premium Media Buying Across MEA

    November 3, 2026

    Abu Dhabi signs four OpenAI deals as Sheikh Khaled meets Altman

    November 3, 2026

    Indonesia’s non-oil exports drive $10.61bn trade surplus

    November 3, 2026

    UAE President and Bavaria’s Söder discuss expanding cooperation

    November 3, 2026

    FirstRand joins African lenders eyeing Kenya bank acquisitions

    November 3, 2026

    Apple iPhone Duo review: an engineering triumph for foldables

    November 2, 2026

    Bangladesh dengue deaths reach 418 after deadliest month of 2026

    November 2, 2026
    © 2026 Kuwait News Hub | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.