Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    WIN EURASIA 2026 to Showcase the Future of Manufacturing

    June 3, 2026

    Deece Unveils AI-powered Platform Transforming How Marketers Brief Campaigns

    June 3, 2026

    DAMAC Digital reaches 6,000MW planned IT capacity landbank across North America, Europe, Asia, and the Middle East

    June 2, 2026
    Facebook X (Twitter) Instagram
    Kuwait News HubKuwait News Hub
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Kuwait News HubKuwait News Hub
    Home » Sinopec’s First Geothermal Power Production Pilot Project Connects to Grid
    PR Newswire

    Sinopec’s First Geothermal Power Production Pilot Project Connects to Grid

    November 6, 2024
    Facebook Twitter Pinterest LinkedIn Reddit WhatsApp Email

    XIANYANG, China, Nov. 6, 2024 /PRNewswire/ — Sinopec Star Co., Ltd., a clean energy subsidiary of China Petroleum & Chemical Corporation (HKG: 0386, “Sinopec”), has received  the grid access permit for its medium and deep geothermal power generation pilot project (the “Project”) in Xianyang, Shaanxi Province, which is officially connected to the grid to produce power.

    Sinopec’s First Geothermal Power Production Pilot Project Connects to Grid.

    The Project, which is now connected to the grid and generating power, marks Sinopec’s first foray into geothermal electricity production and represents China’s inaugural pilot of thermoelectric helium integration—a significant stride toward enhancing the utilization of geothermal resources and optimizing the nation’s energy mix.

    Located in Xianyang in the Guanzhong region, where there is a large medium-low temperature sedimentary basin-type geothermal field known for large scale, high temperature, and superior water quality, the project has selected a geothermal well in Baoshi Jiayuan community with a depth of 3,000 meters and wellhead water temperature of around 102 degrees Celsius.

    During the heating season, the project extracts geothermal water for heating and simultaneous helium extraction for low-load power generation. In the non-heating season, it operates at full load for continuous power generation, also extracting helium. The facility heats an area of 120,000 square meters and generates 700,000 kWh annually.

    Sinopec Star has tackled the core technologies to extract the “golden gas” – helium – in geothermal wells, which is of great strategic importance and widely applied in numerous fields, including  aerospace, R&D, healthcare, and industrial productions. As a major manufacturing country, China has a high demand for helium, but has long relied heavily on imports. Helium is mainly extracted from natural gas, coal bed methane, and by-products of air separation units that contain helium.

    Located in the Weihe Basin, the project area is rich in water-soluble and free helium, along with other gas resources. Sinopec’s experts have discovered unusually high helium concentrations in the region’s geothermal wells. At its Xianyang site, Sinopec Star has advanced the separation and purification of water-soluble helium, achieving 99.99% pure helium through membrane separation and variable pressure adsorption technologies. This success has provided insights for the industrial-scale production of geothermal water-soluble helium.

    Sinopec is a leader in advancing geothermal development, having established more than 100 million square meters of geothermal heating capacity in 72 cities throughout China. Its project in the Xiong’an New Area has been recognized by the International Renewable Energy Agency (IRENA) as a global showcase pilot.

    Logo

    Photo – https://mma.prnewswire.com/media/2549886/Sinopec_s_First_Geothermal_Power_Production_Pilot_Project_Connects_Grid.jpg
    Logo – https://mma.prnewswire.com/media/960416/SINOPEC_Logo.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/sinopecs-first-geothermal-power-production-pilot-project-connects-to-grid-302297222.html


    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Email

    Related Posts

    WIN EURASIA 2026 to Showcase the Future of Manufacturing

    June 3, 2026

    Deece Unveils AI-powered Platform Transforming How Marketers Brief Campaigns

    June 3, 2026

    DAMAC Digital reaches 6,000MW planned IT capacity landbank across North America, Europe, Asia, and the Middle East

    June 2, 2026

    LG Transforms Home Viewing Across the Middle East and Africa with Ultimate Football Season Campaign Featuring Wael Gomaa and Hafid Derradji

    June 2, 2026

    A FRANKFURT LEGEND REDEFINED; TAJ HESSISCHER HOF OPENS ITS DOORS

    June 2, 2026

    Esports World Cup 2026 Venue Announced: Paris Expo Porte de Versailles, Tickets Live Now for All 25 Competitions

    June 1, 2026
    Latest News
    News

    Shanxi coal mine explosion kills 82 workers

    May 25, 2026

    Authorities revised the Shanxi coal mine blast toll to 82 dead as rescue work, hospital treatment and a formal safety probe continued.

    AI chip demand lifts Singapore Q1 GDP growth to 6%

    May 25, 2026

    Measles outbreak in Bangladesh passes 60,000 cases

    May 23, 2026

    UAE and Germany review strategic ties in Berlin

    May 21, 2026

    PM Modi and Meloni spotlight deepening India-Italy ties

    May 21, 2026

    South Korea launches $665.5 million industrial growth fund

    May 20, 2026

    Japan and South Korea launch energy security framework

    May 20, 2026

    Etihad expands Paris route with double daily A380 flights

    May 20, 2026
    © 2026 Kuwait News Hub | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.